Building in Beaverton: Apply for Permits: Site Development

Service Alert!

As part of the City’s response to COVID-19, we are asking that all community members and customers conduct business electronically as much as possible. 

Our Front Desk & Permit Center on the fourth floor of The Beaverton Building continues to remain closed to visitors until further notice. Community Development services are available by email and phone listed in our directory with development and construction  information available at https://www.beavertonoregon.gov/bib. For:

Have a question? View our Customer FAQ section.

To schedule an appointment for in-person services, please leave a message at one of the phone numbers listed above, check out our directory for other service contacts, or contact a staff person who has already been working with you to arrange for services.

Need to submit a payment? Checks can be dropped off in the Water Payment box located off of Millikan Way. Make sure the name of the project and permit number is provided so that the payment can be applied correctly.

Need to submit materials related to a current project? They can be delivered to Beaverton City Hall, at the delivery/staff entrance, located at the corner of SW Rose Biggi and SW Millikan Way. Hours for deliveries are 8AM-12PM and 1PM-4PM. Please email reprographics@beavertonoregon.gov at least one hour prior to your arrival to notify staff when to expect deliveries. 

For more information visit the Novel Coronavirus COVID-19 page.

Site Development (aka Site Engineering)

The Site Development Division reviews sewer repairs, sidewalk repairs, streets cuts, street tree removals and plantings, and engineering design and conducts construction inspections for compliance with the city’s Engineering Design Manual and City Code.

Site Development Applications / Forms

Site Development Fees

Excavator working outside on road construction.

Electronic Submittal

Submissions must follow the Electronic Document Instructions below so that documents can be accurately assigned and routed for review. If you have questions or feedback, please contact us for assistance at 503-350-4021.

Electronic Document Instructions - August 2018

When sending information on applications and permits electronically, please be sure to use the

Electronic Document Transmittal Form

Email your documents to Site Development:

SiteDevelopmentPlanSubmit@beavertonoregon.gov

Submit large files through BOX