Dover South Storm Realignment - CIP 8098A

Storm Drain Realignment at Dover Lane near Oleson Road (Dover South)

Project Description:

  Rehabilitate, replace, and/or realign storm drain pipes that are both old and difficult to access for maintenance.


Project Manager: L. Alan Johansson, 503-526-7595


Project Status:

 FY11/17:  Continue study of the existing storm drain pipes and sewer system and develop design.

FY11/17: Project design.  

FY17/18: Begin construction.



Substantial Completion Date: FY 17/18


 